Investment Feasibility of Ultra-Fast Charging Stations (SPKLU) for the Bakauheni-Terbanggi Route

Authors

  • Eri Prabowo Institut Teknologi Perusahaan Listrik Negara (ITPLN)
  • Trassanda Scudetto Widestomo Putra Institut Teknologi Perusahaan Listrik Negara (ITPLN)
  • Shafia Ananda Institut Teknologi Perusahaan Listrik Negara (ITPLN)

DOI:

https://doi.org/10.58466/ekv7ha54

Keywords:

SPKLU, Financial feasibility, Ultra Fast Charging, Analytical Sensitivity, Electric Vehicles

Abstract

This study evaluates the financial feasibility and risk sensitivity of constructing two 100 kW ultra-fast charging stations for electric vehicles (EVs) along the Bakauheni-Terbanggi Besar Toll Road corridor. This assessment is crucial because the transition to electric vehicles in Indonesia requires reliable charging infrastructure along intercity travel corridors, whereas ultra-fast charging facilities in Sumatra remain limited. The study employs a descriptive quantitative approach using secondary data, including traffic reports, PLN tariff references, BPS (Statistics Indonesia) data, and EV projections. Analysis was conducted using Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period, alongside sensitivity scenarios based on charger occupancy rates and electricity tariffs. The initial investment is estimated at IDR 2.167 billion. A pessimistic scenario involving 12 vehicles per day yielded an IRR of 6.33% and a payback period of 6.73 years, rendering it financially unattractive. Moderate and optimistic scenarios resulted in IRRs of 16.14% and 34.81%, respectively. The findings indicate that the project is feasible under moderate and optimistic conditions but requires phased development, operational risk mitigation, and tariff risk management.

Downloads

Download data is not yet available.

References

[1] A. Ajanovic and R. Haas, "Dissemination of electric vehicles in urban areas: Major factors for success," Energy, vol. 115, pp. 1451-1458, 2016, doi: 10.1016/j.energy.2016.05.040.

[2] M. Coffman, P. Bernstein, and S. Wee, "Electric vehicles revisited: A review of factors that affect adoption," Transport Reviews, vol. 37, no. 1, pp. 79-93, 2017, doi: 10.1080/01441647.2016.1217282.

[3] W. Sierzchula, S. Bakker, K. Maat, and B. van Wee, "The influence of financial incentives and other socio-economic factors on electric vehicle adoption," Energy Policy, vol. 68, pp. 183-194, 2014, doi: 10.1016/j.enpol.2014.01.043.

[4] S. Hardman, A. Jenn, G. Tal, J. Axsen, G. Beard, N. Daina, et al., "A review of consumer preferences of and interactions with electric vehicle charging infrastructure," Transportation Research Part D: Transport and Environment, vol. 62, pp. 508-523, 2018, doi: 10.1016/j.trd.2018.04.002.

[5] Y.-Y. Wang, Y.-Y. Chi, J.-H. Xu, and J.-L. Li, "Consumer preferences for electric vehicle charging infrastructure based on the text mining method," Energies, vol. 14, no. 15, p. 4598, 2021, doi: 10.3390/en14154598.

[6] H. Liu, Y. Li, C. Zhang, J. Li, X. Li, and Y. Zhao, "Electric vehicle charging station location model considering charging choice behavior and range anxiety," Sustainability, vol. 14, no. 7, p. 4213, 2022, doi: 10.3390/su14074213.

[7] P. Morrissey, P. Weldon, and M. O'Mahony, "Future standard and fast charging infrastructure planning: An analysis of electric vehicle charging behaviour," Energy Policy, vol. 89, pp. 257-270, 2016, doi: 10.1016/j.enpol.2015.12.001.

[8] A. Schroeder and T. Traber, "The economics of fast charging infrastructure for electric vehicles," Energy Policy, vol. 43, pp. 136-144, 2012, doi: 10.1016/j.enpol.2011.12.041.

[9] C. Madina, I. Zamora, and E. Zabala, "Methodology for assessing electric vehicle charging infrastructure business models," Energy Policy, vol. 89, pp. 284-293, 2016, doi: 10.1016/j.enpol.2015.12.007.

[10] Z. Dobrowolski and G. Drozdowski, "Does the net present value as a financial metric fit investment in green energy security?" Energies, vol. 15, no. 1, p. 353, 2022, doi: 10.3390/en15010353.

[11] M. V. Sokolov, "NPV, IRR, PI, PP, and DPP: A unified view," Journal of Mathematical Economics, vol. 114, p. 102992, 2024, doi: 10.1016/j.jmateco.2024.102992.

[12] D. A. Mellichamp, "Internal rate of return: Good and bad features, and a new way of interpreting the historic measure," Computers & Chemical Engineering, vol. 106, pp. 396-406, 2017, doi: 10.1016/j.compchemeng.2017.06.005.

[13] A. Awasthi, K. Venkitusamy, S. Padmanaban, R. Selvamuthukumaran, F. Blaabjerg, and A. K. Singh, "Optimal planning of electric vehicle charging station at the distribution system using hybrid optimization algorithm," Energy, vol. 133, pp. 70-78, 2017, doi: 10.1016/j.energy.2017.05.094.

[14] E. Wood, C. Rames, M. Muratori, S. Raghavan, and M. Melaina, National Plug-In Electric Vehicle Infrastructure Analysis. National Renewable Energy Laboratory, 2017, doi: 10.2172/1393792.

[15] D. Xu, W. Pei, and Q. Zhang, "Optimal planning of electric vehicle charging stations considering user satisfaction and charging convenience," Energies, vol. 15, no. 14, p. 5027, 2022, doi: 10.3390/en15145027.

[16] N. Shahraki, H. Cai, M. Turkay, and M. Xu, "Optimal locations of electric public charging stations using real world vehicle travel patterns," Transportation Research Part D: Transport and Environment, vol. 41, pp. 165-176, 2015, doi: 10.1016/j.trd.2015.09.011.

[17] P. Sadeghi-Barzani, A. Rajabi-Ghahnavieh, and H. Kazemi-Karegar, "Optimal fast charging station placing and sizing," Applied Energy, vol. 125, pp. 289-299, 2014, doi: 10.1016/j.apenergy.2014.03.077.

[18] W. Tu, Q. Li, Z. Fang, S.-L. Shaw, B. Zhou, and X. Chang, "Optimizing the locations of electric taxi charging stations: A spatial-temporal demand coverage approach," Transportation Research Part C: Emerging Technologies, vol. 65, pp. 172-189, 2016, doi: 10.1016/j.trc.2015.10.004.

[19] T. Unterluggauer, J. Rich, P. B. Andersen, and S. Hashemi, "Electric vehicle charging infrastructure planning for integrated transportation and power distribution networks: A review," eTransportation, vol. 12, p. 100163, 2022, doi: 10.1016/j.etran.2022.100163.

[20] J. Johnson, T. Berg, B. Anderson, and B. Wright, "Review of electric vehicle charger cybersecurity vulnerabilities, potential impacts, and defenses," Energies, vol. 15, no. 11, p. 3931, 2022, doi: 10.3390/en15113931.

[21] Z. Garofalaki, D. Kosmanos, S. Moschoyiannis, D. Kallergis, and C. Douligeris, "Electric vehicle charging: A survey on the security issues and challenges of the open charge point protocol (OCPP)," IEEE Communications Surveys & Tutorials, vol. 24, no. 3, pp. 1504-1533, 2022, doi: 10.1109/COMST.2022.3184448.

[22] S. R. Kirchner, "OCPP interoperability: A unified future of charging," World Electric Vehicle Journal, vol. 15, no. 5, p. 191, 2024, doi: 10.3390/wevj15050191.

[23] International Energy Agency, Global EV Outlook 2023: Catching up with Climate Ambitions. Paris: OECD Publishing, 2023, doi: 10.1787/cbe724e8-en.

[26] Arif, M., Prabowo, E., & YASSER, R. (2025). Studi Kelayakan PLTS Off-Grid untuk Substitusi Auxiliary Power pada Sistem WTP PLTU Malinau 2X3 MW (Doctoral dissertation, IT PLN).

[27] Anggara, A., Prabowo, E., & Indarto, A. (2025). Studi Kelayakan Finansial Plts On-Grid Untuk Auxiliary Power Pada Pemakaian Sendiri Gardu Induk Tangerang Lama (Doctoral dissertation, IT PLN).

[28] Mr, A., & Prabowo, E. (2025). Analisis Kelayakan Investasi Layanan Pengisian Daya di Rumah (Home Charging Services) Dalam Mendukung Ekosistem Kendaraan Listrik: Studi Kasus PLN UID Riau dan Kepulauan Riau (Doctoral dissertation, ITPLN).

[29] Nugraha, D. A. H., & Prabowo, E. (2026). STUDI KELAYAKAN PENERAPAN TEKNOLOGI V2G PADA BUS LISTRIK TRANSJAKARTA DALAM MENDUKUNG NET ZERO EMISSION 2060 (Doctoral dissertation, Institut Teknologi PLN).

[30] Prabowo, E. (2026). KELAYAKAN TEKNO-EKONOMI PLTSA INSINERASI 10 MW DI TPA TERJUN KOTA MEDAN. Integrative Perspectives of Social and Science Journal, 3(04 April), 1771-1779.

[31] Abdurrohman, M. Z., Batih, H., & Prabowo, E. (2023). Analisis Kelayakan PLTS Atap Menggunakan Metode Real Option dengan Pemanfaatan Insentif Pendanaan: Studi Kasus SMA Future Gate. Dinamika Rekayasa, 19(1), 19-28.

[32] Siregar, W. N. N., & Prabowo, E. (2023). Business Design Of Public Electric Vehicle Charging Stations For Trans Java Cikampek–Surabaya Toll With The Dynamic System Approach. Jurnal IPTEK, 27(1), 37-50.

[32] Ariansyah Putra, M., & Prabowo, E. (2024). Analisis Kelayakan Proyek Pembangunan Pusat Listrik Tenaga Surya (PLTS) Apung Tembesi 40 MWp di Sistem Kelistrikan Batam–Bintan (Doctoral dissertation, IT PLN).

[33] Jaenuddin, M. R., Prabowo, E., & Jaenuddin, N. (2025). Studi Kelayakan Pemasangan Stasiun Pengisian Kendaraan Listrik Umum (SPKLU) di Wilayah Kota Makassar. Journal of Syntax Literate, 10(12).

[34] Putra, M. A., & Prabowo, E. (2026). Feasibility Analysis of the 40 MWp Tembesi Floating Solar Power Plant Development Project. Journal La Multiapp, 7(2), 511-524.

Downloads

Published

2026-06-01