Abstract

Bailey Bridge is a steel frame bridge that is generally used as a temporary emergency bridge. Although this type of bridge has been widely used, one of them is at the location of the Pesaguan-Kendawangan Road, but there are still some obstacles in the steel frame assembly process. Therefore, the researcher wants to make a comparison between the standard method of implementing the Bailey Bridge in the Temporary Bridge Technology book and the method implemented in the location. The purpose of this study was to determine the implementation method of bridge assembly at the location of Jalan Pesaguan-Kendawangan and compare it with the standard method. The research was carried out using observation and interview methods with informants to obtain information about the assembly of the Bailey bridge at the location. The results of observations and interviews were analyzed by comparison with the standard Bailey Bridge. The data obtained shows that there are nine steps of implementing the assembly of Bailey Bridge components at the location of the Pesaguan-Kendawangan Road Section, starting from the assembly of base plate components, panel components, panel post I components, transom components, pin components, bracing components, raker components, panel post II components, and finally the deck plate component. The comparison results show that 6 out of 10 bridge assembly parameters have met existing standards.

References

Murni, Wahid. 2017. Pemaparan Metode Penelitian Kualitatif. Universitas Islam Negeri Malik Ibrahim Malang: Malang.

Moleong, Lexy J. 2002. Metode Penelitian Kualitatif. Remaja Rosdakarya: Bandung

Ismerianto. 2019. Metode Pelaksanaan Struktur Atas Jembatan Tayan. Universitas Tanjung Pura: Pontianak.

Arikunto, Suharsini. 1989. Prosedur Penelitian & Suatu Pendekatan Praktek. Rineka Cipta: Jakarta.

Maskanah, Siti. 2013. Implementasi Kurikulum Diferensiasi sebagai Upaya Pengembangan Program Akselerasi di Madrasah Aliyah Negeri 1 Model Bojonegoro. Istitut Agama Islam Negeri Sungai Ampel Surabaya: Surabaya.

Maryadi, dkk. 2010. Pedoman Penulisan Skripsi FKIP. Universitas Muhammadiyah Surakarta: Surakarta.

Danim, Sudarwan. 2000. Menjadi Peneliti Kualitatif. Pustaka Setia: Bandung.

S. Margono. 1997. Metode Penelitian Pendidikan. Rineka Cipta: Jakarta.

Adi, Winarputro. 2012. Teknologi JembatanSementara Berbahan Dasar Komposit. Kementerian Pekerjaan

Umum: Bandung.

Departemen Pekerjaan Umum, Bidang Cipta Karya. 2015. Profil Kabupaten Ketapang. Departemen Pekerjaan Umum: Ketapang.

Dinas Bina Marga dan Penataan Ruang. 2020. JembatanBailey

Published

2022-01-20

How to Cite

Listiowati, W., Iswandi, A. ., & Kamil, F. (2022). Perbandingan Metode Pelaksanaan Standar Konstruksi Jembatan Bailey dengan Pelaksanaan di Lapangan. Journal of Research and Inovation in Civil Engineering As Applied Science (RIGID), 1(1), 6-12. https://doi.org/10.58466/rigid.v1i1.1179

Issue

Section

artikel