Perencanaan Peningkatan Jembatan Kayu di Jalan Minggu Gembira Desa Sungai Kinjil Pesisir Kecamatan Benua Kayong Kabupaten Ketapang
Keywords:
Improvement Planning, Timber Bridge, Plank Floor Timber BridgeAbstract
The condition of the wooden bridge located on Jalan Minggu Gembira, Sungai Kinjil Pesisir Village is not suitable for use. The bridge is part of the upper structure that moves easily when there is a load passing or passing over the bridge and the bridge bridge does not have a backrest pole, and retaining walls due to this condition the activities of farmers and local residents are hampered. Therefore it is necessary to plan for the improvement of the wooden bridge. This bridge connects settlements with other public facilities. In addition, the bridge with a width of 3 m with a span of 6 m also serves to cross agricultural products. Given the importance of the bridge function in the area, it is necessary to prepare a wooden bridge improvement plan. The purpose of this study is to find out the drawing plan and how much the Budget Plan Cost (RAB) is on the planning of the wooden bridge improvement. Researchers used data collection methods in the form of field observations and data collection of the Ketapang Regency unit price list of materials and wages in 2023 from PUPR to make RAB. After making the drawing plan and analyzing the RAB calculation, it was found that the total cost required in planning the improvement of the wooden bridge on Jalan Minggu Gembira, Sungai Kinjil Pesisir Village, Benua Kayong District, Ketapang Regency was found to be Rp. 71,160,785.
References
Husen, A., & Baranyanan, A. S. (2021). Pengaruh pembangunan infrastruktur pelabuhan, infrastruktur jalan dan infrastruktur jembatan terhadap pertumbuhan ekonomi Maluku Utara. Poros Ekonomi, 10(1).
Harefa, M. B., Rizalitaher, A. S., & Harefa, A. (2023). PERENCANAAN STRUKTUR ATAS (UPPER STRUCTURE) JEMBATAN BILAL. JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality, 7(1), 37-45.
Hadi, N., & Leo, E. (2018). Analisis Perbadingan Perkuatan Jembatan Rangka Baja Dengan Metode Prategang Eksternal Ditinjau Dari Bentuk Trase Kabel Prategang. JMTS: Jurnal Mitra Teknik Sipil, 230-239.
Hidayat, W., & Susilowati, D. (2019). Dampak Pembangunan Jembatan Terhadap Sosial Ekonomi Masyarakat Kademangan, Kecamatan Pagelaran, Kabupaten Malang. Jurnal Ilmu Ekonomi, 3(1), 115-125.
Kamil, F. (2023). PRODUKTIVITAS ALAT BERAT PADA TAHAP PELAKSANAAN PEMANCANGAN TIANG PANCANG (SPUN PILE) PENGGANTIAN JEMBATAN SIDUK 3. Jurnal Konstruksi dan Infrastruktur, 11(2).
Listiowati, W., Iswandi, A., & Kamil, F. (2022). Perbandingan Metode Pelaksanaan Standar Konstruksi Jembatan Bailey dengan Pelaksanaan di Lapangan. Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID), 1(1), 6-12.
Tohari, T., Wardono, H., Waluyo, S., & Suharno, S. (2022). PEMASANGAN PILE JEMBATAN SEDERHANA DENGAN CARA SEDERHANA (MENGGUNAKAN MESIN AIR ALKON 4”) PNPM MP3KI KECAMATAN LABUHAN MARINGGAI KABUPATEN LAMPUNG TIMUR. Jurnal Profesi Insinyur Universitas Lampung, 3(2), 91-95.
. Sangsurya, Y., Muazza, M., & Rahman, R. (2021). Perencanaan Sumber Daya Manusia Dalam Peningkatan Mutu Pendidikan Di Sd Islam Mutiara Al Madan Kota Sungai Penuh. Jurnal Manajemen Pendidikan Dan Ilmu Sosial, 2(2), 766-778.
Pakpahan, A. F., Prasetio, A., Negara, E. S., Gurning, K., Situmorang, R. F. R., Tasnim, T., ... & Rantung, G. A. J. (2021). Metodologi penelitian ilmiah.
Fatonah, K., & Wulansari, D. N. (2017). Estimasi Anggaran Biaya Struktur Proyek Pembangunan Hotel Quad Makassar Menggunakan Metode SNI. Jurnal Kajian Teknik Sipil, 2(2), 116-129.
Suryansyah, S., Purnomo, J., & Kamil, F. (2022). Perencanaan Jembatan Kayu di Jalan Pertanian Desa Mekar Sari Kecamatan Benua Kayong Kabupaten Ketapang. Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID), 1(2), 36-41
Wijanarko, B., & Oetomo, W. (2019). Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan'. Jurnal Untag__.