Evaluasi Overhaul terhadap Efisiensi Boiler Unit 1 PLTU Banjarsari
DOI:
https://doi.org/10.58466/3vjtps23Keywords:
boiler efficiency; overhaul; direct method; indirect method; heat loss; specific coal consumptionAbstract
The boiler is a major component in a steam power plant because it converts feedwater into high-pressure and high-temperature steam for turbine operation. Boiler efficiency decreases when heat-transfer surfaces are dirty, combustion support equipment is not optimal, or operating instruments are inaccurate. This article evaluates the effect of overhaul on Boiler Unit 1 at PLTU Banjarsari using performance-test data at 125 MW. Two calculation approaches are used: the direct method and the indirect or heat-loss method. The direct-method efficiency increased from 67.65% before overhaul to 70.05% after overhaul, indicating a 2.40 percentage-point improvement. The indirect-method efficiency increased from 83.55% to 87.21%, indicating a 3.66 percentage-point improvement. The most relevant technical improvements were cleaning of boiler tubes, repair of a leaking superheater drain pipe, and calibration of the feedwater flow meter. The dry flue-gas loss decreased from 5.034% to 2.765%, while specific coal consumption decreased from 0.611 kg/kWh to 0.590 kg/kWh. These results show that overhaul improves heat utilization and supports more economical boiler operation.
Downloads
References
[1] M. Raut, S. Kumbhare, and R. Thakur, Energy Performance Assessment of Boiler, 2014.
[2] M. K. Bora and N. Nakkeeran, Performance Analysis from the Efficiency Estimation of Coal Fired Boiler, 2014.
[3] U.S. Department of Energy, Improving Steam System Performance: A Sourcebook for Industry, 2004.
[4] T. Srinivas, Efficiency of a Coal Fired Boiler in a Typical Thermal Power Plant, American Journal of Mechanical and Industrial Engineering, 2017.
[5] PT PLN, Buku Pembelajaran Pembangkit Listrik, 2019.
[6] A. Nabawi, Pengaruh Overhaul Terhadap Efisiensi Boiler Unit 3 UJP PLTU Banten 3 Lontar, Skripsi, 2019.
[7] ASME, Performance Test Code for Fired Steam Generators, ASME PTC 4, 2008.
[8] A. Adiyanto, Pengaruh Overhaul Terhadap Efisiensi Boiler Di Unit 1 PLTU Banjarsari, Skripsi, Institut Teknologi PLN, 2020.
[9] Krishnanunni, et al., Evaluation of Heat Losses in Fire Tube Boiler, International Journal, 2012.
[10] Pravitasari, Malino, and Novitasari, Analisis Efisiensi Boiler Menggunakan Metode Langsung, 2017.
[11] Kurniawan, Gunawan, and Maluegha, Kajian Efisiensi Termal dari Boiler di PLTU Amurang Unit 1, 2015.
[12] Subramaniam, Boiler Efficiency Evaluation Using Heat Loss Method, International Journal of Science and Research, 2016.
[13] S. Suntivarakorn and W. Treedet, Improvement of Boiler Efficiency Using Heat Recovery and Automatic Combustion Control System, Energy Procedia, 2016.
[14] Syahputera, Kamal, and Ekayuliana, Specific Fuel Consumption Analysis in Thermal Power Plant Operation, 2018.
[15] Putra TS, Prabowo E, Ramadani F. Pengaruh Overhaul Terhadap Kinerja High Pressure Heater Unit 3 PLTU Banten Lontar. JTM: JURNAL TEKNIK MESIN. 2026 Feb 1;2(1):10-5.