MAINTENANCE ACTIVITY PLANNING FOR FUEL SYSTEM COMPONENTS ON KT-1B AIRCRAFT USING RELIABILITY METHODS

Keywords:
Critical Period, FMEA, FTA, Fuel System, Weibull Distribution, life cycleAbstract
This research aims to prevent unscheduled maintenance by determining the optimal maintenance time to plan preventive maintenance on the fuel system of the KT-1B aircraft. Fuel System components include Engine Driven Pump, Fuel Control Unit. The methods used are Fault Tree Analysis (FTA), Failure Mode and Effect Analysis (FMEA), and Weibull Distribution. This method is to determine the factors causing failure, calculate the failure rate, and system reliability. Factors causing fuel system failure are influenced by age, damaged seals, vibration. The level of reliability of the Fuel System decreases with the length of use. Where the system will experience a critical period when it reaches operational time, namely engine driven pump = 1010 hours with a reliability value of 70%, fuel control unit = 1637 hours with a reliability value of 70.1%. After knowing the critical mass limit of the components, Preventive Maintenance planning will be carried out on the parts and components that cause failure, namely by cleaning the engine driven pump components and the fuel control unit by periodically checking the parts on the KT-1B aircraft.
References
T. Ferdiana and I. Priadythama, “Analisis Defect Menggunakan Metode Fault Tree Analysis (FTA) Berdasarkan Data Ground Finding Sheet (GFS) PT. GMF AEROASIA,” Pros. Semin. Nas. Ind. Eng. Conf. 2016, pp. 1–8, 2015.
D’Ettore, “‘A Revised FMEA application to the quality control management’ D’ Ettore Claudia Paciarotti Giovani Mazzuto Davide SUSANTY,” Int. J. Qual. Reliab. Manag. , vol. 31, no. 7, pp. 788–810, 2014.
C. D. PUTRA, A. SYARIEF, AND H. ISWORO, “ANALISA Kegagalan Menggunakan Metode Failure Mode and Effect Analisys (Fmea) Pada Unit Off-Highway Truck 777D,” Sci. J. Mech. Eng. Kinemat., vol. 3, no. 1, pp. 33–42, 2018, doi: 10.20527/sjmekinematika.v3i1.4.
F. Setiawan, E. Sofyan, and D. Muridha C. Putra, “Analisis Reliability Sistem Starter Valve Untuk Merencanakan Aktivitas Maintenance Pada Pesawat Boeing 737 Next Generation Di Pt Gmf Aeroasia,” Tek. STTKD J. Tek. Elektron. Engine, vol. 6, no. 2, pp. 92–103, 2020, doi: 10.56521/teknika.v6i2.272.
M. Taaqbier, E. Sofyan, and F. Setiawan, “Perancangan Aktivitas Maintenance Dengan Metode Reliability Pada Sistem Auxiliary Power Unit (Apu) Pesawat Boeing 737-500 Studi Kasus Di Pt. Mmf Surabaya,” Tek. STTKD J. Tek. Elektron. Engine, vol. 7, no. 2, pp. 174–183, 2021, doi: 10.56521/teknika.v7i2.318.
V. No, F. Setiawan, E. Sofyan, and M. Hadi, “JOURNAL OF APPLIED MECHANICAL ENGINEERING AND RENEWABLE ENERGY ( JAMERE ) Perencanaan Preventive Maintenance Ram Air Actuator pada Pesawat Boeing 737 Next Generation Menggunakan Metode Reliability Di PT . GMF Aeroasia,” vol. 1, no. 2, pp. 53–62, 2021.
B. Rahmanto, F. Setiawan, and E. Sofyan, “Perancangan Aktivitas Pemeliharaan dengan Metode Reliability pada Sistem Main Rotor Blade Helikopter BELL 412EP Studi Kasus Penerbad Semarang,” J. Appl. Mech. Eng. Renew. Energy, vol. 2, no. 1, pp. 9–15, 2022, doi: 10.52158/jamere.v2i1.243.
F. Setiawan, M. Taaqbier, and M. Anhar, “Perencanaan Preventive Maintenance Menggunakan Metode Reliability Pada Electrical Sistem Auxiliary Power Unit Boeing 737-500,” Inject. Indones. J. Vocat. Mech. Eng., vol. 2, no. 1, pp. 1–8, 2022, doi: 10.58466/injection.v2i1.279.
F. Setiawan, Y. T. Purwantiningsih, and D. Wicaksono, “Schedule Planning and Maintenance Activities Auxiliary Power Unit (APU) Boeing 737-500 Aircraft With Reliability Method,” Pros. Semin. Nas. Sains Teknol. dan Inov. Indones., vol. 3, no. November, pp. 91–102, 2021, doi: 10.54706/senastindo.v3.2021.130.
D. R. F. Saputra, Y. Sukmono, L. D. Fathimahhayati, "Analisis Reliability Pada Mesin Fan Mill Unit 1 Di PT Cahaya Fajar Kaltim," Vol. 10, No. 1, November 2018.
J. Malau and R. Rochiem, "Analisa Kegagalan pada Fuel Intake Manifold Pesawat Terbang Boeing 737-500," Vol. 2, No. 1, 2013