PERENCANAAN PERAWATAN POMPA HIDROLIK PADA FORKLIFT 5 TON TIPE FD 50-7
Keywords:
Forklift, Hydraulic Pump, Maintenance, Preventive Maintenance, Corrective MaintenanceAbstract
Damage to the forklift will cause problems that have an impact on inhibiting other activities. So that good and continuous maintenance is needed to maintain the performance of the tool. The purpose of this study is to plan periodic maintenance on the forklift to avoid damage that can stop the operation of the forklift. The method used in this study is to collect data, make direct observations of the damage that occurs to the hydraulic pump, and conduct interviews with experienced mechanics who handle the forklift. The results of the research are maintenance planning with Preventive Maintenance and Corrective Maintenance methods, by implementing daily, weekly, monthly and yearly maintenance activities. In daily maintenance, inspections will be carried out, check all lubrication and perform service. Daily maintenance is carried out every 8 working hours, weekly is carried out every 60 working hours. Monthly maintenance is carried out every 250 working hours, while annual maintenance is carried out every 2500 working hours. The operation of the 5 tons FD 50-7 Forklift unit must be in accordance with the Manual Book. So that the service life of the unit and its components is in accordance with the life time
References
S. Anggoro, “Pengembangan Sistem Manajemen Perawatan Forklift Dengan Pendekatan Reliability Centered Maintenance (Rcm) Berbasis Oracle Alert System (Studi pada PT Gajah Tunggal Tbk Tangerang),” J. Oper. Excell. J. Appl. Ind. Eng., vol. 6, no. 2, p. 268897, 2014.
B. S. Dhillon, Maintainability, maintenance, and reliability for engineers. CRC press, 2006.
M. Kabib, “Optimasi Perawatan di Industri Manufaktur,” Tek. Mesin, 2009.
W. D. Prabowo, A. S. Wibowo, and M. A. Murti, “Sistem Perawatan Dan Pemecahan Masalah Pada Kompressor Udara Menggunakan Metode Reliability Centered Maintenance Berbasis Iot,” eProceedings Eng., vol. 7, no. 1, 2020.
A. Rachman and G. Rizki, “Optimalisasi Perawatan Kompresor Udara Guna Menunjang Operasional Mesin Induk Di Kapal MT Java Palm,” Meteor STIP Marunda, vol. 13, no. 2, pp. 66–70, 2020.
H. Suwandono, “Analisa Kerusakan Pada Forklift Elektrik Nichiyu Fb20-75c Dengan Metode Fmea,” J. Tek. Mesin, 2016.
J. Rajagukguk, “Analisis Perancangan Forklift Dengan Kapasitas 1 Ton,” J. Kalpika, vol. 7, no. 2, 2011.
P. Průša, S. Jovčić, V. Němec, and P. Mrázek, “Forklift truck selection using TOPSIS method,” IJTTE Int. J. Traffic Transp. Eng. Vol. 8, issue 3, 2018.
E. Suprianto, “PENENTUAN INTERVAL WAKTU PERAWATAN FORKLIFT SCAGLIA BERDASARKAN DATA LAJU KERUSAKAN MESIN DI PT.” X”,” J. Ind. Elektro dan Penerbangan, vol. 1, no. 3, 2011.
P. Simanungkalit, R. Yasra, and B. W. Widiodo, “Perencanaan Sistem Perawatan Alat Angkat Kapasitas 5 Ton dengan Metode Preventive Maintenance (Studi Kasus Pt. Trikarya Alam) The Maintenance System Planning Of Lift Tool With Capacity 5 Ton Using Preventive Maintenance Method (Case Study Pt. Trikarya Ala,” PROFISIENSI J. Progr. Stud. Tek. Ind., vol. 4, no. 1, 2016.
I. Syahroni, “USULAN PERENCANAAN PERAWATAN MESIN FORKLIFT DENGAN METODE RELIABILITY CENTERED MAINTENANCE DI PT. INDOSPRING TBK.” UNIVERSITAS MUHAMMADIYAH GRESIK, 2018.
S. Sahara and A. R. Pradana, “OPTIMALISASI PENGGUNAAN FORKLIFT TERHADAP KELANCARAN PROSES BONGKAR STEEL COIL DI PT. DAISY MUTIARA SAMUDRA,” LOGISTIK, vol. 14, no. 1, pp. 1–10, 2021.
R. Ahmad, S. Kamaruddin, I. Azid, and I. Almanar, “Maintenance management decision model for preventive maintenance strategy on production equipment,” J. Ind. Eng. Int., vol. 7, no. 13, pp. 22–34, 2011.
M. Jasiulewicz-Kaczmarek, “SWOT analysis for Planned Maintenance strategy-a case study,” IFAC-PapersOnLine, vol. 49, no. 12, pp. 674–679, 2016.
A. Prasetyo, A. A. Abdillah, and A. Syuriadi, “Manajemen Perawatan Caterpillar Forklift Dp25nd Di Workshop Alat Berat Politeknik Negeri Jakarta,” in Seminar Nasional Teknik Mesin 2021, 2021, pp. 1602–1608.