[1]
“Analysis of Productivity of Lightweight Brick Wall Installation Work on The Construction of a Hospital with the Work Sampling Method”, RIGID, vol. 4, no. 2, pp. 80–87, Jul. 2025, doi: 10.58466/rigid.v4i2.1890.