“Controlling Cost and Time Progress using Earned Value Analysis Method for Building Projects” (2025) Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID), 4(2), pp. 71–79. doi:10.58466/rigid.v4i2.1877.