“Controlling Cost and Time Progress Using Earned Value Analysis Method for Building Projects”. 2025. Journal of Research and Inovation in Civil Engineering As Applied Science (RIGID) 4 (2): 71-79. https://doi.org/10.58466/rigid.v4i2.1877.