SILITONGA, V.; KHALIFAH, V. A. S.; FANSURI, M. H. Pengendalian Progres Biaya dan Waktu dengan Metode Earned Value Analysis Proyek Gedung. Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID), [S. l.], v. 4, n. 2, p. 71-79, 2025. DOI: 10.58466/rigid.v4i2.1877. Disponível em: https://jurnal.politap.ac.id/index.php/rigid/article/view/1877. Acesso em: 15 jul. 2025.