Pengendalian Progres Biaya dan Waktu dengan Metode Earned Value Analysis Proyek Gedung. (2025). Journal of Research and Inovation in Civil Engineering As Applied Science (RIGID), 4(2), 71-79. https://doi.org/10.58466/rigid.v4i2.1877