[1]
2025. Pengendalian Progres Biaya dan Waktu dengan Metode Earned Value Analysis Proyek Gedung. Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID). 4, 2 (Jul. 2025), 71–79. DOI:https://doi.org/10.58466/rigid.v4i2.1877.