“Perbaikan Faktor Daya Pada Instalasi Listrik 3 Phasa Pabrik Refill Oksigen Kapasitas 105 KVA Dengan Pemasangan Panel Kapasitor Bank”. 2022. Electrical Network Systems and Sources 1 (1): 1-6. https://doi.org/10.58466/entries.v1i1.1113.