[1]
Akhdiyatul, A. 2022. Perbaikan Faktor Daya Pada Instalasi Listrik 3 Phasa Pabrik Refill Oksigen Kapasitas 105 kVA dengan Pemasangan Panel Kapasitor Bank. Electrical Network Systems and Sources. 1, 1 (Jan 2022), 1-6. DOI:https://doi.org/10.58466/entries.v1i1.1113.